± 50 MVAr STATCOM prototype has been made ready for commissioning at Sincan Transformer Substation.
Click for photos

   
31.12.2009
 MV Active Filter Prototype has been successfully commissioned at TEİAŞ Denizli-2 Transformer Substation.
Click for photos
   
24.11.2009
National Power Quality Project Demonstrations were carried out in TEİAŞ General Directorate Building Parking Area and National Power Quality Monitoring Center on 24th and 25th of November 2009.
Click for photos
   
20.11.2009
Measurements with transient events and harmonics measurement systems have been started..
Click for photos
   
16.11.2009
Two theoretical, comprehensive and detailed trainings on power quality, harmonics, the related problems and the solutions of these problems, have been organized in 2007 and 2009 by the project group and the academicians from Yıldız Technical University.
By this way, the participants have been informed about the National Power Quality Project. Moreover, the detailed information with an applied training on National Power Quality Monitoring Center and National Power Quality Client Software are given to the participants.

Click for participant list
Click for photos

   

17.06.2009
Minister of Energy and Natural Resources Mr. Taner YILDIZ has been informed about “National Power Quality Project” at TÜBİTAK Space Technologies Research Institute.  Presentation and system demonstrations have been made about Power Quality Monitoring System, Transient Events and Harmonics Measurement Systems, STATCOM Sub-Project and MV Active Power Filter Sub-Project. Click for photos >

   
Minister of State Mehmet AYDIN has been informed about  “National Power Quality Project” at the time of the visit of TÜBİTAK Space Technologies Research Institute. Click for photos >
   

Prof. Dr. Muammer ERMİŞ, the manager of National Power Quality Project, presented  an invited paper about “National Power Quality Project” in Energy Efficiency and Quality 2009 Symposium, which was performed on 21th and 22th of May. Click for photos >

   
11.05.2009
The ±10MVAr STATCOM laboratory prototype has been completed and the tests are ongoing. In this context, the design and production of H-Bridge modules, which are the main structure of the STATCOM system, have been made. 15 H-Bridges required for STATCOM prototype with ± 10MVAR rated power were placed into CTP frame structure and the links between H-Bridges and frame structure were provided with flexible bars. Thus, the power stage of a ±10MVAR STATCOM unit has been made ready for tests.
   
11.05.2009
The mobile platforms for transient events and harmonics measurement systems were produced.
   
11.05.2009
The Turkish Electricity System is monitored with 153 “National Power Quality Monitor”.
   
01.04.2009
A voltage source hybrid active power filter which has 100 A rated current and is connected to 400 V voltage level has been designed, produced, tested, and put into service in TÜBİTAK UZAY Power Electronics Laboratory.
   
01.03.2009
Testing and measurements of 1 MVA current-source active filter prototype have been completed at BursaRAY plant and it is seen that it meets the project requirements. As envisaged in the project proposal, it is warranted that 11th and 13th current harmonics result from the 12 pulse diode rectifier are below the limit values given in regulations.
   

07.11.2008
Up to now, measurements have been completed in 195 transformer substations within the sub-project of Mobile Power Quality Measurements and reporting activities are going on.

   
  all news >>
   
 

For the purpose of identifying principles, approaches, hardware, and software requirements which will enable Power Quality parameters defined in IEC 61000-4-30- Std. "Electromagnetic compatibility (EMC); Testing and measurement techniques-Power quality measurement methods"to be monitored continuously in the Turkish Electricity Transmission System and carrying out developmental activities accordingly; TEİAŞ, TÜBİTAK-BİLTEN and 4 universities have combined their powers.


TEİAŞ TÜBİTAK UZAY METU
Hacettepe Dokuz Eylül Yıldız Teknik
 
07.11.2008
The first installation of the "National Power Quality Monitor" with racks  was started at 15.09.2008 in "380 KV Sincan Transformer Substation.
   
01.03.2008
The project's 4. Term has been ended successfully with the preparation of the fourth semiannual Development Report.
   
08.12.2006
Mobile Field Measurements taken so far
   
10.08.2006
Project employees have been given skidcar advanced and defensive driving techniques training by an automobile company for mobile field measurements.
   
01.08.2006
Presentation booklet of the project has been prepared.
   
  all announcements >>
   
   
It is the rough definition of the continuity of electricity service, stability of frequency and voltage at the rated values,

and that voltage/current waveforms are absolute sinusoidal waveforms means that there is no power quality problem.

click here to continue
           
     
     
© Copyright 2006 Power Quality
About the project | Participant Institutions | Sub-projects | Links | Documents
Main Page | Contact | Site Map | Turkish
TUBITAK SPACE
METU Campus, 06531, Ankara, TURKEY
Phone: +90 312 210 1310
Fax: +90 312 210 13 15