± 50 MVAr STATCOM prototype has been made ready for commissioning at Sincan Transformer Substation.
Click for photos |
| |
|
 |
31.12.2009
MV Active Filter Prototype has been successfully commissioned at TEİAŞ Denizli-2 Transformer Substation.
Click for photos |
| |
|
 |
24.11.2009
National Power Quality Project Demonstrations were carried out in TEİAŞ General Directorate Building Parking Area and National Power Quality Monitoring Center on 24th and 25th of November 2009.
Click for photos |
| |
|
 |
20.11.2009 Measurements with transient events and harmonics measurement systems have been started..
Click for photos |
| |
|
 |
16.11.2009 Two theoretical, comprehensive and detailed trainings on power quality, harmonics, the related problems and the solutions of these problems, have been organized in 2007 and 2009 by the project group and the academicians from Yıldız Technical University.
By this way, the participants have been informed about the National Power Quality Project. Moreover, the detailed information with an applied training on National Power Quality Monitoring Center and National Power Quality Client Software are given to the participants.
Click for participant list
Click for photos |
| |
|
 |
17.06.2009
Minister of Energy and Natural Resources Mr. Taner YILDIZ has been informed about “National Power Quality Project” at TÜBİTAK Space Technologies Research Institute. Presentation and system demonstrations have been made about Power Quality Monitoring System, Transient Events and Harmonics Measurement Systems, STATCOM Sub-Project and MV Active Power Filter Sub-Project. Click for photos > |
| |
|
 |
Minister of State Mehmet AYDIN has been informed about “National Power Quality Project” at the time of the visit of TÜBİTAK Space Technologies Research Institute. Click for photos > |
| |
|
 |
Prof. Dr. Muammer ERMİŞ, the manager of National Power Quality Project, presented an invited paper about “National Power Quality Project” in Energy Efficiency and Quality 2009 Symposium, which was performed on 21th and 22th of May. Click for photos > |
| |
|
 |
11.05.2009
The ±10MVAr STATCOM laboratory prototype has been completed and the tests are ongoing. In this context, the design and production of H-Bridge modules, which are the main structure of the STATCOM system, have been made. 15 H-Bridges required for STATCOM prototype with ± 10MVAR rated power were placed into CTP frame structure and the links between H-Bridges and frame structure were provided with flexible bars. Thus, the power stage of a ±10MVAR STATCOM unit has been made ready for tests. |
| |
|
 |
11.05.2009
The mobile platforms for transient events and harmonics measurement systems were produced. |
| |
|
 |
11.05.2009
The Turkish Electricity System is monitored with 153 “National Power Quality Monitor”. |
| |
|
 |
01.04.2009
A voltage source hybrid active power filter which has 100 A rated current and is connected to 400 V voltage level has been designed, produced, tested, and put into service in TÜBİTAK UZAY Power Electronics Laboratory. |
| |
|
 |
01.03.2009
Testing and measurements of 1 MVA current-source active filter prototype have been completed at BursaRAY plant and it is seen that it meets the project requirements. As envisaged in the project proposal, it is warranted that 11th and 13th current harmonics result from the 12 pulse diode rectifier are below the limit values given in regulations. |
| |
|
 |
07.11.2008
Up to now, measurements have been completed in 195 transformer substations within the sub-project of Mobile Power Quality Measurements and reporting activities are going on.
|
| |
|
| |
all news >> |
| |
|