Now, TEIAS has two different kinds of data:
- Monthly readings of energy meters based on invoicing in Electricity Transmission System,
- The values of electrical magnitudes taken after being sampled for each minute at the points that SCADA System measured, the production values collected from approximately 160 transformer substations or plants in which RTU has been set up by SCADA System, line flows, transformer loads (MV, MVAr) and busbar voltages (kV) are kept in the archive as one minute average.
Within this sub-project, database will be composed and evaluated for retroactive energy meter readings and recent SCADA data.
Later on, this process will be continued by TEIAS staff in a systematic way and it will be transmitted to the new generations. Even if they are monthly data, they will give an idea about in which lines and at which points of the Transmission System reactive energy flows are much, and at which points voltage regulation is not enough, and energy interruptions. In this way, the critical points of the Transmission System that will be measured by sampling method will be clearer.
Project Head: Hüsnü Aksakallı
|